Live city solar profile

Solar panels in Amsterdam

Each kilowatt of south-facing panels at 30° in Amsterdam generates about 1,016 kWh per year, ranging from 26 kWh in Dec to 133 kWh in May.

Annual yield

1,016 kWh/kWp

Best month

May · 133 kWh

Year-to-year variation

±47 kWh

Reference payback*

10 years

Monthly production per kWp

The strongest month produces 5.1× the weakest month.

Compare cities
View monthly data table

Jan31.8 kWh

Feb49 kWh

Mar88.8 kWh

Apr121.5 kWh

May132.6 kWh

Jun131 kWh

Jul128.1 kWh

Aug115.2 kWh

Sep93.3 kWh

Oct62.8 kWh

Nov36.2 kWh

Dec25.8 kWh

Source: EU JRC PVGIS 5.3 , PVGIS-SARAH3 (2005–2023), 52.3676, 4.9041, 5 m elevation. Retrieved 2026-11-17. *Reference payback uses illustrative defaults (5 kWp, €1,300/kWp, €0.25/kWh) — not a local market price.

What a 5 kWp system means

At this location's modelled yield, a 5 kWp first-year array would produce about 5,080 kWh. Your usable savings depend on when you consume electricity, not just this total.

Versus Netherlands

This profile is 0% above the average of the 1 Netherlands city currently in this directory. That is a comparison of modelled city-centre points, not roof suitability.

Seasonality matters

Output peaks in May and bottoms in Dec. A high annual total can still leave winter imports; batteries and tariffs need an hourly assessment.

Estimate your own payback in Amsterdam

Replace every illustrative assumption with your own quote and bill. Adjust roof settings under Advanced.

Amsterdam, Netherlands1,016 kWh/kWp

Your quote & bill

5 kWp
€1,300/kWp

Use the complete figure from your quote.

€0

Enter only support you have verified.

4,500 kWh

Sum the last 12 months on your bills.

€0.25/kWh

The unit charges you avoid by using less grid electricity.

€0.06/kWh
40%

An annual assumption, not a battery dispatch simulation.

2%

Estimated simple payback

10years

Upfront cost

€6,500

Year-1 savings

€691

25-yr net gain

€10,006

Return (IRR)

8.5%

Compare saved

Year-1 production

5,080 kWh

Bill covered by solar

45%

Discounted cost / solar kWh

€0.115

Cumulative cash position

NPV @4%: €3,563

PVGIS PVGIS-SARAH3 (2005–2023), 30° tilt, 0° aspect, 14% losses. 0.5%/yr degradation, €15/kWp/yr maintenance. Retrieved 2026-11-17.

View annual cash-flow table
YearGenerationSavingsCostsCumulative
15,080 kWh€691€75-€5,884
25,055 kWh€699€77-€5,261
35,030 kWh€708€78-€4,631
45,004 kWh€717€80-€3,994
54,979 kWh€726€81-€3,350
64,954 kWh€734€83-€2,698
74,930 kWh€744€84-€2,039
84,905 kWh€753€86-€1,372
94,881 kWh€762€88-€698
104,856 kWh€772€90-€16
114,832 kWh€781€91€673
124,808 kWh€791€1,293€171
134,784 kWh€801€95€877
144,760 kWh€811€97€1,590
154,736 kWh€821€99€2,312
164,712 kWh€831€101€3,042
174,689 kWh€842€103€3,781
184,665 kWh€852€105€4,528
194,642 kWh€863€107€5,284
204,619 kWh€874€109€6,048
214,596 kWh€885€111€6,822
224,573 kWh€896€114€7,604
234,550 kWh€907€116€8,395
244,527 kWh€919€118€9,196
254,504 kWh€930€121€10,006

Quote sensitivity

If every other assumption stayed the same:

Installed cost -15% → 8.6 years

Installed cost +15% → 13.1 years

Independent quote audit

Is your installer's quote telling the truth?

Enter what the installer promised. We test each claim against PVGIS satellite data for this exact roof and stress-test the economics. The figures above (cost, tariff, self-use) are treated as the quote.

Installer's claims (0 = not stated)
Battery in the quote? (0 = none)
What does the quote/contract include?
D

Audit score 53/100

Significant screening issues: renegotiate or obtain alternative quotes.

PVGIS year-1 output

5,080 kWh

Claim vs PVGIS

—

Independent payback

10 yrs

Break-even price

€2,013/kWp

  • No annual generation figure stated

    A quote without a written generation estimate cannot be verified. Request one with the method used.

  • Return turns negative under combined stress

    The project only works if yield, prices and self-use all hold. Build in a margin of safety.

  • 6 critical contract protections missing

    Itemised quote (panels, inverter, mounting, labour, electrical); Panel product and performance warranty stated (brand, model, years, % output); Inverter model and warranty term stated; Installer workmanship / roof-penetration warranty; Grid / network connection paperwork and meter changes included; Staged payment — balance due only after commissioning.

Full Quote Audit Dossier (PDF)

Graded verdict, generation forensics with monthly chart, six downside scenarios, battery due diligence, 25-year ledger, contract checklist and a tailored list of questions to send your installer.

Nearby solar profiles