What a 5 kWp system means
At this location's modelled yield, a 5 kWp first-year array would produce about 5,611 kWh. Your usable savings depend on when you consume electricity, not just this total.
Live city solar profile
Each kilowatt of south-facing panels at 30° in Paris generates about 1,122 kWh per year, ranging from 39 kWh in Dec to 136 kWh in Jul.
Annual yield
1,122 kWh/kWp
Best month
Jul · 136 kWh
Year-to-year variation
±49 kWh
Reference payback*
9 years
The strongest month produces 3.5× the weakest month.
Jan40.3 kWh
Feb60.6 kWh
Mar97.7 kWh
Apr126.9 kWh
May130.7 kWh
Jun132.8 kWh
Jul135.7 kWh
Aug124.8 kWh
Sep108.7 kWh
Oct77.3 kWh
Nov47.6 kWh
Dec39.2 kWh
Source: EU JRC PVGIS 5.3 , PVGIS-SARAH3 (2005–2023), 48.8566, 2.3522, 41 m elevation. Retrieved 2026-11-17. *Reference payback uses illustrative defaults (5 kWp, €1,300/kWp, €0.25/kWh) — not a local market price.
At this location's modelled yield, a 5 kWp first-year array would produce about 5,611 kWh. Your usable savings depend on when you consume electricity, not just this total.
This profile is 16.1% below the average of the 3 France cities currently in this directory. That is a comparison of modelled city-centre points, not roof suitability.
Output peaks in Jul and bottoms in Dec. A high annual total can still leave winter imports; batteries and tariffs need an hourly assessment.
Replace every illustrative assumption with your own quote and bill. Adjust roof settings under Advanced.
Paris, France1,122 kWh/kWp
Use the complete figure from your quote.
Enter only support you have verified.
Sum the last 12 months on your bills.
The unit charges you avoid by using less grid electricity.
An annual assumption, not a battery dispatch simulation.
Estimated simple payback
9years
Upfront cost
€6,500
Year-1 savings
€763
25-yr net gain
€12,107
Return (IRR)
9.9%
Year-1 production
5,611 kWh
Bill covered by solar
50%
Discounted cost / solar kWh
€0.104
PVGIS PVGIS-SARAH3 (2005–2023), 30° tilt, 0° aspect, 14% losses. 0.5%/yr degradation, €15/kWp/yr maintenance. Retrieved 2026-11-17.
| Year | Generation | Savings | Costs | Cumulative |
|---|---|---|---|---|
| 1 | 5,611 kWh | €763 | €75 | -€5,812 |
| 2 | 5,583 kWh | €772 | €77 | -€5,116 |
| 3 | 5,555 kWh | €782 | €78 | -€4,412 |
| 4 | 5,527 kWh | €792 | €80 | -€3,700 |
| 5 | 5,500 kWh | €801 | €81 | -€2,980 |
| 6 | 5,472 kWh | €811 | €83 | -€2,251 |
| 7 | 5,445 kWh | €821 | €84 | -€1,515 |
| 8 | 5,418 kWh | €831 | €86 | -€769 |
| 9 | 5,390 kWh | €842 | €88 | -€16 |
| 10 | 5,364 kWh | €852 | €90 | €747 |
| 11 | 5,337 kWh | €863 | €91 | €1,518 |
| 12 | 5,310 kWh | €874 | €1,293 | €1,099 |
| 13 | 5,283 kWh | €884 | €95 | €1,888 |
| 14 | 5,257 kWh | €895 | €97 | €2,686 |
| 15 | 5,231 kWh | €907 | €99 | €3,494 |
| 16 | 5,205 kWh | €918 | €101 | €4,311 |
| 17 | 5,179 kWh | €930 | €103 | €5,138 |
| 18 | 5,153 kWh | €941 | €105 | €5,974 |
| 19 | 5,127 kWh | €953 | €107 | €6,820 |
| 20 | 5,101 kWh | €965 | €109 | €7,675 |
| 21 | 5,076 kWh | €977 | €111 | €8,541 |
| 22 | 5,050 kWh | €990 | €114 | €9,417 |
| 23 | 5,025 kWh | €1,002 | €116 | €10,303 |
| 24 | 5,000 kWh | €1,015 | €118 | €11,200 |
| 25 | 4,975 kWh | €1,028 | €121 | €12,107 |
If every other assumption stayed the same:
Installed cost -15% → 7.7 years
Installed cost +15% → 10.3 years
Independent quote audit
Enter what the installer promised. We test each claim against PVGIS satellite data for this exact roof and stress-test the economics. The figures above (cost, tariff, self-use) are treated as the quote.
Audit score 53/100
Significant screening issues: renegotiate or obtain alternative quotes.
PVGIS year-1 output
5,611 kWh
Claim vs PVGIS
—
Independent payback
9 yrs
Break-even price
€2,269/kWp
No annual generation figure stated
A quote without a written generation estimate cannot be verified. Request one with the method used.
Return turns negative under combined stress
The project only works if yield, prices and self-use all hold. Build in a margin of safety.
6 critical contract protections missing
Itemised quote (panels, inverter, mounting, labour, electrical); Panel product and performance warranty stated (brand, model, years, % output); Inverter model and warranty term stated; Installer workmanship / roof-penetration warranty; Grid / network connection paperwork and meter changes included; Staged payment — balance due only after commissioning.
Full Quote Audit Dossier (PDF)
Graded verdict, generation forensics with monthly chart, six downside scenarios, battery due diligence, 25-year ledger, contract checklist and a tailored list of questions to send your installer.